Corner Tube Boiler – 2 Sets (75 t/h) (China, 2017-2018)

GB China 2017-2018 Power Plant

GB-compliant corner tube boiler twin units with sequential delivery and coordinated commissioning for continuous power generation.

Project Gallery

Detailed views of the corner tube boiler twin-unit project

Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 8

Project Snapshot

Core project information at a glance

Project Information

Field Value
Product Corner Tube Boiler – 2 Sets (75 t/h each)
Design Code GB
Country / Region China
Year 2017, 2018
Industry / Application Power Plant
Scope Type Twin-Unit Boiler System Supply

Client Core Needs

Key requirements for twin-unit deployment

GB Code Compliance

Full compliance with Chinese GB standards for domestic market

Sequential Delivery

Phased installation across 2017-2018 to meet project milestones

Uniform Design Standards

Identical twin units for simplified operation and maintenance

ORL Solution

Comprehensive twin-unit delivery approach

GB-Compliant Design & Manufacturing

Full adherence to Chinese national standards

Standardized Twin-Unit Configuration

Identical design for operational efficiency

Synchronized Manufacturing Schedule

Coordinated production for sequential delivery

Quality Consistency Across Units

Unified inspection and testing protocols

Phased Installation Support

On-site technical supervision for each unit

Comprehensive Documentation Package

Complete records for both units with GB compliance

Quality & Documentation Package

Comprehensive quality assurance for twin-unit projects

Material Certificate / EN 10204 3.1

(as required)

Full Traceability

(heat no. tracking)

Dimensional Inspection Report

Comprehensive measurements

Hydro Test Record

(if applicable)

GB Compliance Verification

Code compliance documentation

ITP / QCP Support

(if required)

Third-party Inspection Support

(if required)

Duplicate Documentation Sets

Separate packages for each unit

Get Custom Quotation – Send Your Requirements

Quotation is based on product specification, code requirements and acceptance documentation needs

Required Information for RFQ

Drawing / product specification

Design code (ASME/EN/GB)

Operation conditions (pressure/temperature)

Required documentation & inspection

Quantity & delivery time